top of page
CMiC Job Costing
CMiC Job Costing Implementation: Structuring Cost Codes Correctly the First Time
CMiC Job Costing is where construction ERP is supposed to earn its keep - tying labor, materials, and subcontractor cost back to a specific job in real time. Most firms never get the full value of it, and the reason almost always traces back to one decision made in the first few weeks of configuration: how cost codes and cost types get structured. The Structure Decision That Determines Everything After It Cost code and cost type structure determines what kind of job cost repo
2 min read
bottom of page
